More than a dozen pallets of greyblock are now positioned on the site to be placed on the footings and create the basin into which the concrete slab will be poured. You can tell how far up the grayblock needs to go: the wood framing on the far side of …
Construction photos: week 3 (footings)
With everything looking good, Week 3 started to show real progress. In the first half of the week, trenches for the footings were dug. Here is the amazing backhoe that did that work: Why do I say “amazing”? Because the hydraulic backhoe was a revolutionary piece of machinery that made …
Construction photos: week 2 (grading)
After the “first scrape” cleared out the surface material and verified that the dirt was good, the grading team set out to really find the best “finished floor elevation”. From the start, the vision for the building was to integrate it with the land. The topography of the location helped …
Construction photos: week 1 (scraping)
After more than a year of planning, pleading, plotting, and praying, actual construction has begun! Here a photos showing the land just before and just after the first actual site work. Let’s start the tour! These first two views are taken from near our lily pond (actually a rain garden …