Things have been quiet inside the studio this past week; not so outside! A succession of machines has been transforming our landscape from this: to this:
Week 164 (Glass Diffusors)
Last week was all about getting the console commissioned. This week was all about getting the rest of the Control Room finished, notably the glass diffusors. Two years ago this month I published a posting titled “A prototype” and this week that prototype became an actual installation. The prototype: The …
Week 163 (Commissioning the API Vision)
Nearly three months ago we chose the week of February 14th as the date for commissioning our API Vision console. And every day since then had been a sprint to get ready for that date. Along the way we hit innumerable obstacles, and every time we needed a do-over, we’d …
Week 162 (Prep for API Console)
If this blog posting appears to be a little bit late, it’s because last week was a long week. Nevertheless, the preparations were successful, and so here are the construction photos for the last bit of work before installing the console. To finish the Music Room, we had to install …
Week 161 (Control Room Window)
One of the great milestones in the construction of any recording studio is the installation of the Control Room window. We have now achieved that milestone: The physical properties of the glass are impressive. Pictured above, the 4′ x 14′ outer plate is 1/2″ thick and weighs nearly 400 lbs. …
Week 160 (Variac Panel)
Some things take longer than others. A little more than two years ago I advertised that the studio would be using Variac transformers instead of more modern technologies. This was not a “retro at all costs” decision (though Variacs can be used to provide a really, really great dimming system), …
Week 159 (Coverings…an incomplete list)
Looking at the few photos from this past week, the unifying theme seems to be that of coverings—things that lay on top of other things. For example, granite countertops now cover the cabinetry in the Lounge: and in Booth A:
Week 158 (Music Room Floor, 2nd Coat)
Two weeks ago I gushed about how much more beautiful one coat of Tung Oil made the Music Room floor. Well, it looks even better with a second treatment: And a slightly wider view:
Week 157 (QR Terminations)
It’s now time to shine a little light on the work of our intrepid wiring crew. It was back in May [Week 122] when the wiring team first started pulling analog signal wires through our conduits, which connect the Control Room to the wall panels. A week later [Week 123] …
Week 156 (Finishing the Music Room Floor)
The last month of blog postings ([1]. [2], [3], [4]) have all had one theme in common: work is progressing, even if you cannot really see it. Then Christmas came, and one of the most highly visible features of the studio was suddenly finished: Tung Oil, the finish, is known …