When Wes Lachot first put pencil to paper to design Manifold Recording, he’d always imagined I’d have an API Vision console in the main control room, and he design the scale of that room accordingly. More than a year after that, and nearly two years ago to this date, and …
Week 154 (Sanding the Music Room Floor)
In some ways, the progress this week has been lots of small things. But in another, progress has definitely been made on one very large thing: the Music Room floor is no longer a staging area for other work, but an object of work itself. We’ve come a long way …
Week 153 (Final Tech Wire Pull)
There has been some visible progress on the project this past week, but the most important (even if it is the least visible) was the successful completion of the last technical wiring pull. For months we’ve been stymied by a break somewhere in a 4″ conduit between the Main and …
Week 152 (One Step Back)
Sometimes, in order to make progress, one must take a step backward. Or three. This past week was mostly one of remediation. First up was the reconstruction of one of the soffits in the Music Room. If you look very, very closely at this image, you might see the problem …
Week 151 (Construction of the Walling)
Two months ago, the completion of the Music Room Cloud gave me the opportunity to take a step back from basic progress reports and to talk more broadly about the aesthetics and architecture of the project, in particular the way that large features of the studio design fit together into …
Week 150 (Booth A Wood Trim)
With Booth B’s wood trim being finished last week, it’s probably no surprise that this week we finished the wood trim for Booth A: It looks gorgeous, but because it is wood, it looks different from every angle:
Week 149 (Booth B Wood Trim)
As usual, it is difficult to pick a title for this blog entry because so many milestones are being reached across the project, but I chose to begin with the progress in Booth B because it is such a logical successor to last week’s posting about the Control Room Wood …
Week 147 (Music Room Floor, Part 2)
Started in earnest last week, the floor of the Music Room remains this week’s major production. And indeed, progress is looking good: Here is that progress from another perspective:
Week 146 (Music Room Floor, Part 1)
The installation of the wood floor in the Music Room is now in full swing, for real this time. Here are three perspectives of first twelve diamonds: Despite the awful spectrum of the mercury-vapor work lamp, these images do show how the wood appears to change color as one moves …
Week 145 (IAC Door Installation)
This week our door installation team hung 12 more IAC doors, all in the Main building. In this photo you can see 9 of them (if you know what to look for): That’s one and a half tons of hardware that moves with effortless precision. Let’s rewind a bit to …